Remodel the LBJ Nursing Unit 2C – Semi-Private Room Conversion Project

INTRODUCTIONS

1. Facilities ?
2. LBJ Ops Mgr. ?
3. LBJ Nursing ?
4. LBJ Engineering –
5. LBJ Bio-Med –
6. LBJ Security ?
7. LBJ Safety ?
8. LBJ IP ?
9. LBJ EVS ?
10. IT Low voltage ?
11. HCED Contract Compliance:

B. PROJECT SCOPE REVIEW

1. The Preconstruction Conference planning agenda will be distributed
2. The phase 1 project will remodel the LBJ Nursing Unit 2C to the standards developed for
The Semi-Private Room Conversion Project. New flooring, new paint, new ceiling tiles,
New millwork, and selected new furniture and equipment will be provided. A designated
Semi-private and isolation room will be ADA/TDLR accessible. All bed rooms will have
New roll-in type showers with ceramic tile floors and walls. Existing plumbing fixtures,
Lights and doors will be used. There will be very few new doors needed. Construction
Will be provided by Construction Manager.
3. Project Manager will need to coordinate utility shutdowns with Risk Assessment team.
4. Engineering will take advantage of the nursing unit being down and work on Maintenance
Items needing routine or long term maintenance.

harrishealth.org
C. SCHEDULE

1. The construction phases take about 6 months to complete. This phase is schedule to
Start September 6, 2016 and complete in March 3, 2017.
2. The Contractor shall coordinate with EVS to remove any bio-hazard or medical supplies.
3. The Contractor confirmed all on-site personnel will have completed the LRC training for
Construction workers.
4. The team was notified that it would need to reassess risks should the scope change.
5. The Contractor shall monitor staff behavior to ensure all Harris Health policies and
Safety procedures are followed.arrishealth.org
6. The Contractor shall maintain all records and documentation and make them available
To the team.
7. The Contractor shall maintain constant communication with the Planning PM for all
General activities changes, new obstructions of egress, on-site conflicts or issues that
May arise, and project scope changes.
8. IP shall ensure Contractor and subs are educated about infection risks and conduct